The New TOP in pictures

  • 3D section

    This 3D section of the proposed design for the existing Courtyard Theatre auditorium structure. It shows our flexible studio auditorium in the centre, with two rehearsal rooms suspended above it. To the right of the auditorium is the proposed Costume Store on three levels, with curved rails on the upper storeys.

  • auditorium drawing

    A sketch of the proposed auditorium, a 200-300 seat studio theatre which can be used in different configurations giving it more flexibility that the old 170-seat TOP.

  • colour auditorium drawing

    A colour sketch of the auditorium and stage for the proposed new TOP.

  • Costume exhibition

    As well as creating a flexible studio space, we hope to relocate our Costume Store making over 30,000 costumes available to the public for the first time through our theatre tours.

  • Rehearsal

    Under our proposal, the remodelled TOP would include two new rehearsal rooms suspended from the roof, bringing the actors back from the edge of town location and creating a hub of activity close to our main theatres.

    Photo shows actors rehearsing for Richard III (2012) directed by Roxana Silbert.

  • The Courtyard Theatre

    TOP was our studio theatre where many of our smaller productions were staged and new work developed in Stratford-upon-Avon.

    It closed in 2005 to accommodate the creation of the temporary Courtyard Theatre which housed productions during the Complete Works Festival and our core work during the closure of the main theatres for the transformation.

Contact us & FAQs

Ticket Hotline

0844 800 1110
Mon-Sat, 10am-6pm

Email newsletter

Sign up to email updates for the latest RSC news:

RSC Members

Already an RSC Member or Supporter? Sign in here.